The 9 System [+]
The 9 System is a pre-fabricated coping system for overflowing pools. It comprises a set of water-repellent concrete blocks designed so that a single piece acts as a drainage channel and ceramic support.
The 10 System [+]
The new revolutionary “System 10” pool tank construction system uses the latest in design innovation making the once impossible, possible. To construct level deck swimming pools in record time by using an interlocking pre-cast concrete panel system.
Fixcer [+]
One of the keys to obtaining good technical and aesthetic results is the use of the proper fixing materials. Rosa Gres and Fixcer are the perfect team that guarantees a solid building system and optimum finishes.